8D Template8D Template

8D report

Fill in the nine disciplines below. The form saves itself in this browser as you type; nothing is sent anywhere. Print it or save it as a PDF when the report is ready, or copy it as text. Not sure what belongs in a box? See what each discipline must show.

D0 Emergency response

Protect the customer the same day, then decide whether a full 8D is needed.

Emergency response actions
ActionOwnerDateResult

D1 Establish the team

A small, dedicated team: a leader who drives the investigation, a sponsor who removes roadblocks and keeps the customer informed, experts only when needed. Review the team at the start of each discipline.

Team
RoleNameFunction / titleContact (phone, email)
Sponsor
Team leader
Member
Member
Member
Member

D2 Describe the problem

One failure mode in measurable terms: what is wrong with what, where it is first seen, since when, how many parts, what it costs.

IS / IS NOT
ISIS NOT
What
Where
When
How many

D3 Interim containment

Sort suspect parts as far upstream as possible, on a criterion that demonstrably predicts the customer’s experience, and name the breakpoint from which shipments are clean.

Containment actions
Action (sort, 100% inspection, rework, certified stock)Process step / locationOwnerImplemented onEffective?

D4 Root cause and escape point

The cause–effect relationship that explains the difference between good and bad parts, proved by switching the problem on and off — and the control that should have caught it.

D5 Choose and verify the permanent corrective action

Set a tolerance or control for the proven cause, choose the action with the people who will live with it, and show in a trial that it improves the output before it is implemented.

Corrective actions
#Corrective actionAddressesOwnerPlanned dateVerification before implementationVerified?
1
2
3
4

D6 Implement and validate

Implement as a project, prove the effect with a before-and-after run chart, update standard work, and remove the containment once it stops finding suspect parts.

Implementation
#ActionImplemented onValidation evidence (run chart before/after, capability, audit)Result
1
2
3
4

D7 Prevent recurrence

Fix the system that allowed the cause, update the documents, and read across to similar products, processes and plants.

Read-across
Similar product / process / siteActionOwnerDate
Documents updated
DocumentChangeOwnerDate
Process FMEA
Control plan
Work instructions
Inspection standard
Drawing / specification
Training records
Other

D8 Close and recognize the team

Record the business result, recognize the team, and get the customer’s sign-off.

Sign-off
RoleNameSignatureDate
Team leader
Sponsor
Quality manager
Customer representative

8D report template · 8dtemplate.com/ · Stuck at D4? Talk to a Shainin expert: shainin.com/contact-us

What you type stays in this browser’s local storage until you clear the form. It is never sent to us or to anyone else. About the template